By principle, Lean Manufacturing is never
fixed; it is continuously improving and developing through the creativity of
its users.
For example, the following diagram illustrates a Lean
production environment who has already implemented the Ecoflex system for its
material handling solution, creating increased productivity and efficiency at
the line side. However, even still, small mudas remain; (1) muda of waiting for parts to arrive and transportation using
the small train. Also (2) motion in
determining and selecting parts from the racks, and inventory being stored on
the line side.
Source: Vision-Lean |
Creating an advanced Lean solution with Ecoflex
Once a JIT system has been implemented and a pull system
utilized, lean manufacturing can evolve further into an advanced system with
Ecoflex used as a catalyst. For example, material staging stations have
been moved to the immediate vicinity of the line side and set up in the
preparation zone where they are “kitted” - decanted from numerous containers
into a single point of use.
The principle of this development is to improve the function
of the conventional lean shop stocks by (1)
introducing a sequence preparation zone: a local material handler prepares each
“kit” for each model which is then delivered on line by hand pushed mobile
carts with Ecoflex.
Source: Vision-Lean |
The end result is a reduction of the residual mudas of
waiting, motion and inventory to their simplest form by sequenced parts and
delivering kits directly to the line. The operator (2) only has to turn around, pick the kit and assemble it without
having to manage a variety of parts.
This method further improves the level of added value at the
workstation, by reducing the muda of repair/rejects which could be generated by
picking the wrong part.
Although the manpower to sort the parts at (1) may increase
the logistic time due to the additional preparation, the cost of this logistics
load is compensated by the additional line productivity gains:
- Additional space at the line side.
- Reduction of other mudas, especially those of transport and inventory: elimination of motorized trains through use of the manual Ecoflex carts, together with simple and compact line side racks, which could be equipped with an automatic return of empty bins.
- Reduction of the muda of repair/rejects from accidental part picking.
Previous Post: Eliminating Muda with Ecoflex and IPS
---
Integrated Products
& Services Inc. was established in 2006 as a lean manufacturing and
material handling consultation firm and have grown into a leader in the
distribution of modular pipe racking and shelving systems in Canada.
No comments:
Post a Comment